A two-phase heuristic algorithm for cell formation problems considering alternative part routes and machine sequences

Chang Ouk Kim, Jun Geol Baek, Jong Kwan Baek

Research output: Contribution to journalArticlepeer-review

40 Citations (Scopus)

Abstract

In this paper, we deal with the multi-objective machine cell formation problem. This problem is characterized as determining part route families and machine cells such that the total sum of inter-cell part movements and maximum machine workload imbalance are simultaneously minimized. Together with the objective function, alternative part routes and the machine sequences of part routes are considered in grouping part route families. Also, it is assumed that the number of machine cells is not pre-defined. Owing to the complexity of the problem, a two-phase heuristic algorithm is proposed. Computational experiments were conducted to verify the performance of the algorithm. Throughout the computational experiments, we verified that the two-phase heuristic algorithm is effective for large-scale machine cell formation problems.

Original languageEnglish
Pages (from-to)3911-3927
Number of pages17
JournalInternational Journal of Production Research
Volume42
Issue number18
DOIs
Publication statusPublished - 2004 Sept 15
Externally publishedYes

ASJC Scopus subject areas

  • Strategy and Management
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering

Fingerprint

Dive into the research topics of 'A two-phase heuristic algorithm for cell formation problems considering alternative part routes and machine sequences'. Together they form a unique fingerprint.

Cite this