Abstract
The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade: improved RPC in stations RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.
Original language | English |
---|---|
Article number | C10025 |
Journal | Journal of Instrumentation |
Volume | 15 |
Issue number | 10 |
DOIs | |
Publication status | Published - 2020 Oct |
Keywords
- Muon spectrometers
- Resistive-plate chambers
ASJC Scopus subject areas
- Instrumentation
- Mathematical Physics