Skip to main navigation Skip to search Skip to main content

Delay analysis of an M/G/1/K priority queueing system with push-out scheme

  • Yutae Lee*
  • , Bong Dae Choi
  • , Bara Kim
  • , Dan Keun Sung
  • *Corresponding author for this work

    Research output: Contribution to journalArticlepeer-review

    Abstract

    This paper considers an M/G/1/K queueing system with push-out scheme which is one of the loss priority controls at a multiplexer in communication networks. The loss probability for the model with push-out scheme has been analyzed, but the waiting times are not available for the model. Using a set of recursive equations, this paper derives the Laplace-Stieltjes transforms (LSTs) of the waiting time and the push-out time of low-priority messages. These results are then utilized to derive the loss probability of each traffic type and the mean waiting time of high-priority messages. Finally, some numerical examplesare provided.

    Original languageEnglish
    Article number14504
    JournalMathematical Problems in Engineering
    Volume2007
    DOIs
    Publication statusPublished - 2007

    ASJC Scopus subject areas

    • General Mathematics
    • General Engineering

    Fingerprint

    Dive into the research topics of 'Delay analysis of an M/G/1/K priority queueing system with push-out scheme'. Together they form a unique fingerprint.

    Cite this