Delay analysis of packet scheduling with multi-users diversity in wireless CDMA systems

  • Sung Kyung Kim*
  • , Chung Gu Kang
  • *Corresponding author for this work

    Research output: Contribution to journalArticlepeer-review

    Abstract

    There have been a number of studies that investigate efficient packet scheduling schemes to support quality of service of multiple real-time data users and to increase capacity of non-real-time users sharing a wireless channel. We consider the problem of scheduling transmissions of multiple data users sharing the same wireless channel so as to satisfy delay or throughput and present a general packet scheduling, called MBCS (Multi-users Best Channel Scheduling) which takes advantage of the multi-user diversity of a mobile wireless system. In this paper, a queuing model that represents radio resource management for supporting packet data services is developed for the purpose of evaluating the performance of wireless CDMA systems. Numerical results show that delay performance of the proposed scheduler is higher than that of the Single-user Best Channel Scheduler (SBCS) depending on the time-varying channel status.

    Original languageEnglish
    Pages (from-to)235-241
    Number of pages7
    JournalWireless Networks
    Volume11
    Issue number3
    DOIs
    Publication statusPublished - 2005 May

    Bibliographical note

    Funding Information:
    This work was supported by the Ministry of Information and Communication, Korea, under the ITRC (Information Technology Research Center) support program.

    Keywords

    • CDMA
    • Channel condition
    • Multi-users diversity
    • Packet scheduling

    ASJC Scopus subject areas

    • Information Systems
    • Computer Networks and Communications
    • Electrical and Electronic Engineering

    Fingerprint

    Dive into the research topics of 'Delay analysis of packet scheduling with multi-users diversity in wireless CDMA systems'. Together they form a unique fingerprint.

    Cite this