Keyphrases
Cone Resistance
100%
Penetration Rate
100%
Clayey Soil
100%
Shear Strength
75%
Calibration Chamber
75%
Cone Penetration Test
50%
Partially Drained
50%
Drainage Condition
50%
Rate of Increase
25%
Mixing Ratio
25%
Process Transition
25%
Sand-clay Mixtures
25%
Coefficient of Consolidation
25%
Permeameter Test
25%
Penetrometer
25%
Flat Tip
25%
Physical Processes
25%
Clayey Silt
25%
Silty Clay Layer
25%
Silt-clay
25%
Cone Tip
25%
Rate Effect
25%
Calibration Field
25%
Clayey Sand
25%
Sand Mixtures
25%
Groundwater Table
25%
Field Penetration
25%
Penetration Testing
25%
Flexible Wall Permeameter
25%
Loading Rate
25%
Engineering
Rate of Penetration
100%
Penetration Resistance
100%
Calibration Chamber
100%
Shear Strength
100%
Cone Resistance
66%
Penetration Rate
66%
Cone Penetration Test
66%
Test Site
33%
Groundwater Table
33%
Clay Layer
33%
Earth and Planetary Sciences
Shear Strength
100%
Physical Process
33%