T1 - Numerical simulation of epb shield tunnelling with tbm operational condition control using coupled DEM–FDM
AU - Lee, Hyobum
AU - Choi, Hangseok
AU - Choi, Soon Wook
AU - Chang, Soo Ho
AU - Kang, Tae Ho
AU - Lee, Chulho
N1 - Funding Information:
Funding: This research was supported by the Korean Agency for Infrastructure Technology Advancement under the Ministry of Land, Infrastructure and Transport of the Korean government (No. 21SCIP-C129646-05).
Funding Information:
Acknowledgments: The authors appreciate the support of the Korea Agency for Infrastructure Technology Advancement under the Ministry of Land, Infrastructure and Transport of the Korean government.
Publisher Copyright:
© 2021 by the authors. Licensee MDPI, Basel, Switzerland.
PY - 2021/3/2
Y1 - 2021/3/2
N2 - This study demonstrates a three-dimensional numerical simulation of earth pressure balance (EPB) shield tunnelling using a coupled discrete element method (DEM) and a finite difference method (FDM). The analysis adopted the actual size of a spoke-type EPB shield tunnel boring machine (TBM) consisting of a cutter head with cutting tools, working chamber, screw conveyor, and shield. For the coupled model to reproduce the in situ ground condition, the ground formation was generated partially using the DEM (for the limited domain influenced by excavation), with the rest of the domain being composed of FDM grids. In the DEM domain, contact parameters of particles were calibrated via a series of large-scale triaxial test analyses. The model simulated tunnelling as the TBM operational conditions were controlled. The penetration rate and the rotational speed of the screw conveyor were automatically adjusted as the TBM advanced to prevent the generation of excessive or insufficient torque, thrust force, or chamber pressure. Accordingly, these parameters were maintained consistently around their set operational ranges during excavation. The simulation results show that the proposed numerical model based on DEM–FDM coupling could reasonably simulate EPB driving while considering the TBM operational conditions.
AB - This study demonstrates a three-dimensional numerical simulation of earth pressure balance (EPB) shield tunnelling using a coupled discrete element method (DEM) and a finite difference method (FDM). The analysis adopted the actual size of a spoke-type EPB shield tunnel boring machine (TBM) consisting of a cutter head with cutting tools, working chamber, screw conveyor, and shield. For the coupled model to reproduce the in situ ground condition, the ground formation was generated partially using the DEM (for the limited domain influenced by excavation), with the rest of the domain being composed of FDM grids. In the DEM domain, contact parameters of particles were calibrated via a series of large-scale triaxial test analyses. The model simulated tunnelling as the TBM operational conditions were controlled. The penetration rate and the rotational speed of the screw conveyor were automatically adjusted as the TBM advanced to prevent the generation of excessive or insufficient torque, thrust force, or chamber pressure. Accordingly, these parameters were maintained consistently around their set operational ranges during excavation. The simulation results show that the proposed numerical model based on DEM–FDM coupling could reasonably simulate EPB driving while considering the TBM operational conditions.
KW - Coupled numerical analysis
KW - Discrete element method
KW - Earth pressure balance shield
KW - Finite difference method
KW - Operational condition
KW - Tunnel boring machine
UR - http://www.scopus.com/inward/record.url?scp=85102923993&partnerID=8YFLogxK
U2 - 10.3390/app11062551
DO - 10.3390/app11062551
M3 - Article
AN - SCOPUS:85102923993
SN - 2076-3417
VL - 11
JO - Applied Sciences (Switzerland)
JF - Applied Sciences (Switzerland)
IS - 6
M1 - 2551
ER -