TY - GEN
T1 - Voltage stability monitoring using PMU data in KEPCO system
AU - Han, Sangwook
AU - Lee, B.
AU - Kim, S.
AU - Moon, Y.
AU - Chang, B.
AU - Shin, J.
PY - 2010
Y1 - 2010
N2 - Kepco has installed PMUs at three of its major transmission lines in 2009. An advanced algorithm, WAVI(Wide Area Voltage stability Index), has proposed in order to monitor the real-time voltage stability in metropolitan area of Korea. This paper presents a brief summary of the installation planning and provides details on results from the real-time measured data, which are obtained from those PMUs. Monitoring strategy and future plans of the PMU installation and the control system research are discussed.
AB - Kepco has installed PMUs at three of its major transmission lines in 2009. An advanced algorithm, WAVI(Wide Area Voltage stability Index), has proposed in order to monitor the real-time voltage stability in metropolitan area of Korea. This paper presents a brief summary of the installation planning and provides details on results from the real-time measured data, which are obtained from those PMUs. Monitoring strategy and future plans of the PMU installation and the control system research are discussed.
KW - Phasor measurement unit
KW - Synchronised measurement
KW - Wide area voltage stability index
UR - http://www.scopus.com/inward/record.url?scp=77954773907&partnerID=8YFLogxK
U2 - 10.1109/TDC.2010.5484257
DO - 10.1109/TDC.2010.5484257
M3 - Conference contribution
AN - SCOPUS:77954773907
SN - 9781424465477
T3 - 2010 IEEE PES Transmission and Distribution Conference and Exposition: Smart Solutions for a Changing World
BT - 2010 IEEE PES Transmission and Distribution Conference and Exposition
T2 - 2010 IEEE PES Transmission and Distribution Conference and Exposition: Smart Solutions for a Changing World
Y2 - 19 April 2010 through 22 April 2010
ER -